Authorize the job in writing.

Put the scope, the site, the dates and the price on one page, get it signed, and stop relying on a text message that says “go ahead”.

Your business (issuer)
Assigned to
Work order details
Scope of work

One row per task. Leave the rate at 0 if the price is quoted on a separate estimate.

Notes & site instructions

Everything runs locally. No file, no field, no contractor name is ever uploaded.

How it works

  1. Describe the job. One row per task, with a quantity and a rate. If the price is not settled, leave the rate at 0 and say so in the notes.
  2. Set the site and the date. Add the ticket reference, the scheduled date and who to call on arrival.
  3. Get it signed. Download the PDF, sign it, and send it before the work begins. The contractor quotes the WO number on the invoice.

What goes on a work order

  • A work order number and the date it was issued
  • Who is authorizing the work, with a contact and a phone number
  • The contractor or technician, and the crew if it matters
  • The site address, unit number and access instructions
  • The scope — one line per task, with quantities
  • Who supplies materials, and who disposes of waste
  • The scheduled date and the expected duration
  • The price, the hourly rate, or a not-to-exceed amount
  • A signature line for authorization and a completion note

Work order vs purchase order vs invoice

A purchase order is a buying document. It commits money to a supplier for goods or services and follows a purchasing process. A work order describes a job at a site: what needs doing, where, when and for how much. A invoice asks to be paid once the job is done.

In practice, a maintenance team may raise a purchase order for the spend and a work order for the actual visit. If you are the contractor, the work order is your authorization; if you are the buyer, it is your record of what you agreed to. The purchase order generator covers the buying side.

Change orders: the text message is not enough

Most disputes about service work are not about the original scope — they are about the extra hours nobody wrote down. When the job grows, issue a change order or a new work order with the added tasks and the new price, and get it approved before the crew starts. That protects the contractor from unpaid extras and protects the client from a surprise invoice.

Site access and safety

Put the practical details on the work order: gate codes, parking, the site contact, working hours, lock-up rules, and any permit or safety requirement. A technician who arrives without access burns billable time, and that argument is always easier to win when the instructions are printed on the sheet.

Close the loop

When the work is finished, note what was actually done and have the site contact sign off. The contractor then raises an invoice that quotes the work order number, and the two documents match line for line. If the scope changed, the approved change order sits between them.

FAQ

Is a work order a contract?

It can work as one. A signed work order that names the parties, the scope, the site and the price is usually treated as a binding agreement for that job. For a large project, or anything with unusual liability, use a full contract as well.

Who issues a work order?

Usually the party paying for the work: a property manager, a facilities team, a general contractor or a client. The contractor signs to accept the job, then quotes the work order number on the invoice.

Does a work order need a signature?

There is no federal requirement. In practice a signature is the cheapest protection you have: it is the difference between “I approved this” and “I never agreed to that.” Have the person who controls the budget sign before the work starts.

What is the difference between a work order and a purchase order?

A purchase order is a buying document for goods or services in a standard purchasing flow. A work order authorizes a specific job at a specific site, often service, repair or maintenance. Many businesses use both.

Is my data uploaded?

No. The form and the PDF run in your browser. Nothing is sent to a server.